Texas Construction and Maintenance Report: February 1998: Searching Inside

We Found:

11 results that matched your query.

Page: Page8 (standard view) | zoom view

... TO DATE * COMP* LAMAR FM 38 ' 7.050 '... 02983027 ' TOTALS ' 1,162,336.02' .00' .00' 0.0' LAMAR...' ********************************************************************************************* LAMAR TIGERTONN ' 25.128 '... OF EXISTING ROADWAY ' ' ' ' LAMAR...' ************************************************************************************************ LAMAR FM 1184 ' 15.377 '

Page: Page9 (standard view) | zoom view

...* *********************************************************,e*a** ********4,,******************************* LAMAR AT FM 1508... + LAMAR IN RENO AT ANDERSON DRIVE ' .001 '...' ***************************************************************4**s********************************* LAMAR VARIOUS LOCATIONS...' ***************************************************************,***,,******************************** LAMAR AT N SULPHUR RIVER ' .615 '

Page: Page13 (standard view) | zoom view

...' ***********************************************************,**************************************** LAMAR FM 196 ' 5.794 '...************************************ LAMAR RED RIVER C/L ' .100 ' 366,403.72

  • Enclose phrases in quotation marks.
  • Use alternate spellings.
  • Limit or remove special characters and punctuation.

When this item was originally scanned, we used Optical Character Recognition (OCR) technology to "read" and save text embedded in the image. OCR is not fool-proof, however. While the overall quality of the OCR results is generally good, the results may vary depending on legibility of the original materials.

Back to Top of Screen