Texas Governor's Committee on People with Disabilities Annual Report: 1997 Page: ii
viii, 29 p. : ill.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
ii
Waco Suspension Bridge
A massive 473-foot suspension span, completed in 1869 over the Brazos River in downtown Waco. The bridge cables and
materials were hauled overland to the bridge site since Waco lacked railroad connections at the time.
The bridge is the earliest known bridge in the state.m
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Matching Search Results
View six pages within this report that match your search.Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Texas Governor's Committee on People with Disabilities. Texas Governor's Committee on People with Disabilities Annual Report: 1997, report, 1997; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth1204423/m1/4/?q=Lamar+University: accessed June 8, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.