182 Matching Results

Search Results

School Building, Nolan County, Texas: Power Room Details

Description: Power room details for a school building in Nolan County, Texas. It includes section, east elevation, and plan for the power room.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building Addition, Merkel, Texas: Basement Plan

Description: Basement plan for an addition to a high school building in Merkel, Texas. It includes a detailed floor plan with labeled rooms and dimensions.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Nolan County, Texas: Roof Plan

Description: Roof plan for a school building in Nolan County, Texas. It includes a layout of the building's roof, as well as rear and side elevations.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building Addition, Merkel, Texas: Floor Plans and Schedules

Description: Floor plans and schedules for an addition to a high school building in Merkel, Texas. It includes first floor, second floor, and foundation plans, plan showing new work in girl's toilet, and miscellaneous sections, as well as lintel beam, door, window, footing, and grade beam schedules.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Floor Plan

Description: Floor plan for a high school building in Paint Rock, Texas. It includes a detailed floor plan with locker rooms, an auditorium and gymnasium, study halls, corridors, and recitation rooms.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Elevations

Description: Elevation plan for a high school building in Paint Rock, Texas. It includes details/drawings of the side, front, and rear elevations.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Plans and Schedules

Description: Architectural plan for a high school building in Paint Rock, Texas. It includes a detailed floor plan, a locker room plan, and schedules of room and finish, door and transom, and window.
Date: October 30, 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Pyron Consolidated County Line Rural High School, Pyron, Texas: Furniture and Closet Details

Description: Building plan for the Ward School building in Pyron, Texas. It includes details on a stationary door, sliding door, boards, lockers and trophy case, corridor moulding, toilet room partitions, coat hangers, bulletin board elevation, elevation of book case, elevation of wardrobe, and elevation of teacher's closet.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Fuel Oil Apparatus Pipes

Description: Blueprint depicting technical details of Battleship Texas.
Date: November 23, 1935
Partner: Texas Parks & Wildlife Department

High School Building, Wylie, Texas: Plot Plan and Alternates

Description: Architectural plan for a high school building in Wylie, Texas. It includes a plot plan, partial floor plan, and several alternate plans.
Date: October 30, 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Elevations

Description: Elevation plan for a high school building in Paint Rock, Texas. It includes details/drawings of the side, front, and rear elevations.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Floor Plans and Schedules

Description: Floor plan for a high school building in Paint Rock, Texas. It includes a detailed floor plan with various classrooms as well as an auditorium/gymnasium and stage. There is also a plan of shower and locker rooms under bleachers, door and transom schedule (top left), and a window schedule (left).
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Foundation Plan and Details

Description: Foundation plan for a high school building in Paint Rock, Texas. It includes a detailed foundation plan, scale details of entrance at "A", scale details of boiler room, typical pier, footing, and grade beam, grade beam schedule, and various sections.
Date: October 30, 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Section Thru Building On Line

Description: Building plan for a high school building in Paint Rock, Texas. It includes detail on a section thru building on line, stage front access doors, plan of monitor construction, elevation of front and side of top to proscenium arch pilasters, monitor windows and wall, west wall gym, and part sectional elevation of gymnasium looking to stage.
Date: October 30, 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: First Floor Mechancial Plan

Description: Mechanical plan for a high school building in Paint Rock, Texas. It includes a detailed mechanical plan for the first floor with heating, plumbing, and electrical symbols with the codes on the right side along with notes. There is also a diagram of the boiler connections as well as a section thru recirculating duct for auditorium unit heaters. The first floor includes various classrooms as well as an auditorium/gymnasium.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building, Paint Rock, Texas: Room base

Description: Building plan for a high school building in Paint Rock, Texas. It includes detail of blackboard trim, plastered walls, room base, wire moulding, picture moulding, and scale details of lockers and trophy case.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen