2 Matching Results

Search Results

Southeast Corridor Light Rail Transit in Dallas County, Texas: Final Environmental Impact Statement and Section 4(f) Statement

Description: This report describes the transportation and environmental impacts and proposed mitigation measures associated with the construction and operation of a proposed Light Rail Transit (LRT) line from downtown Dallas to Buckner Boulevard. This project in DART's Southeast Corridor has been combined with the contemporaneous plan for an LRT line in the Northwest Corridor into a single, federally funded project, although separate Environmental Impact Statements (EISs) were prepared for each corridor. Th… more
Date: October 2003
Creator: Dallas Area Rapid Transit
Partner: Dallas Area Rapid Transit (DART)

Final Report Major Investment Study for the DART Northwest Corridor

Description: Purpose of report is to explain public and agency involvement in the MIS process, document the evaluation process and alternatives considered, document detailed evaluation results, and present the elements of the Locally Preferred Investment Strategy.
Date: October 2000
Creator: Dallas Area Rapid Transit
Partner: Dallas Area Rapid Transit (DART)
Back to Top of Screen