The following text was automatically extracted from the image on this page using optical character recognition software:
Bank Buil! ing
The Fort Worth National bank's main lobby is the place to watch construction progress at the new motor bank being built across the street. A T-V monitor in the lobby is linked by a circuit to a camera peeking out of a thir'i-story bank window at the work being done below. Right now, construction crews are busy n digging a big hole in the ground to put the bank in.
LONG OF HOLE IN FENCE For the oln fashioned sidewalk superintendent, there's
a hole cut in the siue of a wooden fence. notice it's protected by a mesh screen.
You'11 This is
to prevent rock fragments from being blown into the street, or into the faces of spectators. Blasting
goes on throughout the day.
The T-V monitor in
the main bank building also picks up sound from the site, including the muffled. roar of