Railroad Commission of Texas Drilling, Completion, and Plugging Summary: April,1983 Page: Front Cover
2 p.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
jc-,
R553.& Se63 93/1
RAILROAD
COMMIrSION OF TEXAS
DRILLING, COMPLETION, AND PLUGGING SUMMARY
FOR PERIOD: APRIL 1, 1983 THROUGH APRIL 30, 1983TEXAS STATE DOCUMENTS
COLLECTIONState Totals
This 19831982
Activity by
District
for This Period
Period To Date To Date 01 02 03 04 05 06 7B 7C 08 8A 09 10
COMPLETIONS
Oil Discovery 68 275 186 4 6 14 6 0 2 6 9 8 1 11 1
Oil Existing Field 1,072 4,560 5,910 164 14 100 34 33 50 148 93 159 75 162 40
Oil Completions-Total 1,140 4,835 6,096 168 20 114 40 33 52 154 102 167 76 173 41
Gas Discovery 101 385 511 0 19 19 33 2 3 7 1 8 1 7 1
Gas Existing Field 382 1,312 1,570 9 29 36 61 15 33 45 35 11 1 76 31
Gas Completions-Total 483 1,697 2,081 9 48 55 94 17 36 52 36 19 2 83 32
Service Completions-Total 43 241 237 4 0 0 0 1 1 12 1 9 7 7 1
TOTAL COMPLETIONS 1,666 6,773 8,414 181 68 169 134 51 89 218 139 195 85 263 74
NEW HOLES DRILLED
Oil Discovery 67 269 180 4 6 14 5 0 2 6 9 8 1 11 1
Oil Existing Field 1,032 4,376 5,692 157 14 99 27 33 47 148 91 146 73 159 38
Oil Holes-Total 1,099 4,645 5,872 161 20 113 32 33 49 154 100 154 74 170 39
Gas Discovery 78 306 445 0 17 15 25 2 .3 7 1 0 1 6 1
Gas Existing Field 300 1,046 1,372 9 19 16 51 14 33 39 33 10 1 44 31
Gas Holes-Total 378 1,352 1,817 9 36 31 76 16 36 46 34 10 2 50 32
Service Holes-Total 43 237 229 4 0 0 0 1 1 12 1 9 7 7 1
*Dry Wildcat 184 1,113 1,102 12 0 10 7 1 0 77 22 12 8 35 0
*Dry Existing Hole 259 1,109 955 13 3 13 50 0 11 68 25 30 16 27 3
*Dry Holes-Total 443 2,222 2,057 25 3 23 57 1 11 145 47 42 24 62 3
TOTAL NEW HOLES DRILLED 1,963 8,456 9,975 199 59 167 165 51 97 357 182 215 107 289 75
HOLES PLUGGED
Oil 296 1,120 890 63 4 2 31 10 19 33 23 29 11 60 11
Gas 113 453 665 0 10 23 18 10 20 0 8 9 0 15 0
Service 85 146 81 0 1 0 66 0 3 2 1 7 4 0 1
*Dry 465 2,256 2,070 56 22 23 4 1 11 155 47 42 24 72 8
TOTAL HOLES PLUGGED 959 3,975 3,706 119 37 48 119 21 53 190 79 87 39 147 20TOTAL COMPLETIONS INCLUDE:
37 Dual Oil,
42 Dual Gas and 5 Triple Gas.
due to changes in reporting system.
NON (CiRCUS
* Dry hole data not comparable
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Railroad Commission of Texas. Railroad Commission of Texas Drilling, Completion, and Plugging Summary: April,1983, report, May 1983; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth1034014/m1/1/: accessed July 17, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting UNT Libraries Government Documents Department.