2.0 Public and Agency Involvement Program
2.2.2 Public Meetings
Table 2.2 provides a summary of public meetings held during the MIS. All of these meetings
were scheduled to coincide with a project milestone. The May 1998 meetings obtained
information on defining the universe of alternatives to study. The August 1998 meetings
presented the results of the Alternatives Selection phase of the evaluation process. The May
1999 meetings presented the Conceptual Evaluation results and the alternatives to be carried
into the detailed evaluation. The Fall 1999 public meetings presented the Detailed Evaluation
results and summarized the emerging consensus that would be presented to the DART Board
for consideration as the Locally Preferred Investment Strategy (LPIS).
TABLE 2.2
SUMMARY OF PUBLIC MEETINGSMay 1998 Joint Public
Meetings (with SH 183 and
Loop 12/IH 35E MIS Teams)Project Initiation,
Universe of
Alternatives InputIrving (Gilbert Elem.)
U0
Irving (Wilson World) 50
Farmers Branch
70
August 1998 Public Meetings Alternatives Selection Irving 45
Results Input Farmers Branch 50
Carrollton 50
Dallas 90
May 1999 Public Meetings Conceptual Evaluation Carrollton 35
Results Input Irvin 40
Dallas 20
Fall 1999 Public Meetings Detailed Evaluation Dallas 80
Results Input Irving 110
Carrollton 70
SOURCE: BRW, Inc.; DART; January 2000.2.2.3 DART Board and Committee Meetings
During the course of the MIS process, several meetings were held with the DART Planning
Committee to brief Board members on the progress of the study. Presentations to the DART
Board were made at key decision milestones to approve resolutions. Table 2.3 provides a
summary of the meetings and briefings to the DART Board or its committees, including the
discussion items addressed.Northwest Corridor MIS
MIS Final Report12
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Dallas Area Rapid Transit. Final Report Major Investment Study for the DART Northwest Corridor, report, October 2000; (https://texashistory.unt.edu/ark:/67531/metapth1148413/m1/23/?rotate=270: accessed July 17, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting Dallas Area Rapid Transit (DART).