Imperial Sugar Company Actual and Projected Operations: December 1975
Page:
1 of 2
[1] p. ; 28 cm.
View a full description of this report.
These controls are experimental and have not yet been optimized for user experience.
The following text was automatically extracted from the image on this page using optical character recognition software:
IMPERIAL SUGAR COMPANY
ACTUAL AND PROJECTED OPERATIONS - YEAR 1975
(In Cwts. )
December 2,
OPERATIONS
ACTUAL:
January
Shutdown i/i1
February
March
Shutdown
April
DAYS
3 days /wk.
4 .days /wk.
4 days /wk.
3 /28
May
Shutdown 5/26*
June
Plus I Sun.
July
Plus 1 Sun.
August
Plus 1 Sat.
September
Plus 1 Sat.
October
November
Shutdown 11
TOTAL
5 days /wk.
5 days /wk.
6 days/wk.
6 days /wk.
Shutdown 7/4*-
5 days/wk.
5 days /wk.
Shutdown 9/1 .
4 days/wk.
5 days /wk.
/27* & 28*.
14
16
17
22
21
26
26
22
22
19
5.
18
223
RATE/DAY
29. 3M
31. 1M
32. OM
33. 8M
33A 4M
31. 1M
32. 7M
32. 5M
31. 9M
31. 6M.
30. 7M
32. OM
PRODUCTION
397 856
497 861
561 651
742 579
700 846
807 767
851 388
715 781
702 497
601 007
552 860
7 132 093
SHIPMENTS
446 624
514 111
601 500
729 496
703 924
817 521
906 489
713 322
672 618
633 522
572 763
7 311 890
ON HANI
176 940
170 100
130 72C
151 020
149 750
159 000
88 52C
124 525
156 05C
140 48C
121 40C
PROJECTED:
12/1-12 Incl.
12/15-19
12/21-23
12/28--30
1975
December
23
*Holiday
32. OM
736 000
580 000
277 40C
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.