Imperial Sugar Company Actual and Projected Operations: October 1975
Page:
1 of 2
[1] p. ; 28 cm.
View a full description of this report.
These controls are experimental and have not yet been optimized for user experience.
The following text was automatically extracted from the image on this page using optical character recognition software:
IMPERIAL SUGAR COMPANY
ACTUAL AND PROJECTED OPERATIONS - YEAR 1975
(In Cwts. )
October 2,
OPERATIONS
ACTUAL: DAYS RATE/DAY
PRODUCTION
SHIPMENTS
ON HANI
January 3 days /wk.
Shutdown 1 /1*.
February
March
Shutdown
April
May
4 days /wk.
4 days /wk.
3/28*.
5 days /wk.
5 days/wk.
Shutdown 5/26*.
June
Plus 1 Sun.
July
Plus 1 Sun.
August
Plus 1 Sat.
September
Plus 1 Sat.
6 days /wk.
6 days /wk.
Shutdown 7/4*-5.
5 days /wk.
5 days /wk.
Shutdown 9/1*.
TOTAL
14
16
17
22
21
26
26
22
29. 3M
31. 1M
32. OM
33. 8M
33.4M
31. 1M
32. 7M
32. 5M
31. 9M
32. 1M
22
186
397 856
497 861
561 651
742 579
700 846
807 767
851 388
715 781
702 497
5 978 226
446 624 176 940
514 111
601 500
729 496
703 924
817 521
906 489
713 322
672 618
170 100
130 720
151 020
149 750
159 000
88 520
124 525
156 050
6 105 605
PROJECTED:
October
November
4 days /wk.
5 days /wk.
Shutdown 11/27* & 28*,
December 5 days/wk.
Shutdown 12/22-26 incl.
& 12/31*.0
TOTAL
19
18
17
54
32. OM
32. OM
32. OM
32. OM
608 000
576 000
544 000
1 728 000
610 000
575 000
545 000
1 730 000
*holiday
1975
154 050
155 050
154 050
I
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.