Materials selection for concrete overlays : the final report Page: 43
xviii, 192 p. : col. ill. ; 28 cm.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
for the paving machine. Figure 3.10 shows the deposited concrete waiting for the paving
machine to catch up, and Figure 3.11 shows the dried surface around the concrete. The contractor
was asked to slow the depositing of concrete ahead of the paving machine.Figure 3.9. A worker spraying water on the surface ahead of the paver
Figure 3.10. Concrete too far ahead of the paving machine
43
" _ _ ",l_
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Kim, Dong H.; Fowler, David W.; Ferron, Raissa P.; Trevino, Manuel M. & Whitney, David P. Materials selection for concrete overlays : the final report, report, July 2012; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth303706/m1/63/: accessed July 17, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting UNT Libraries Government Documents Department.