Water Supply Facility Planning - New Terrell City Lake
City of Terrell
6.2 Texas Water Development Board Comments .................................................6-1
7.0 M eetings ................................................... ....................................................... ................ 7-1
7.1 Pu blic M e etings ...................... . ...................................................................................7-1
7.2 M eeting W ith Raw W ater Users ......... ..... .... ............... ..... .........7-1
7.3 Meetings With Canton, DWU, and NTMWD ......... ............. .....................7-1
8.0 Conclusions/Recom m endations ...................................................... .................. ......................8-1
LIST OF TABLES
Table ES-1 Summary of Cost Estimates for Feasible Water Supply Alternatives......................... ES-3
Table 1-1 Potential Users of New Terrell City Lake and Their Projected Water Needs....................1-3
Table 2-1 W ater Availability Analysis for New Terrell City Lake ....................... .........................2-5
Table 3-1 Existing Pum ps at New Terrell City Lake .......................... .................................. ... 3-1
Table 3-2 Current Value of Existing Pump Station Facilities at New Terrell City Lake ......................3-3
Table 3-3 Project Costs for New Terrell City Lake Water Supply to Canton ....................................3-10
Table 3-4 Project Costs for New Terrell City Lake Water Supply to DWU .......................................3-12
Table 3-5 Project Costs for New Terrell City Lake Water Supply to NTMWD ...............................3-13
Table 3-6 Project Costs for New Terrell City Lake Water Supply to SRA ......................................3-13
Table 3-7 Sum m ary of Costs........................................................................ .............. ........................ 3-15
Table 4-1 Maintenance Reparis Cost Estimates......................................4-8
Table 4-2 Sum mary of Dam M odifications ................................................. ............................4-21
Table 4-3 Sum mary of Cost Estim ates ........................................................ ................ ......4-22
LIST OF FIGURES
Figure ES-1 Study Area............................ ES-2
Figure 2-1 New Terrell City Lake Storage, Firm Yield = 2,400 ac-ft/yr ..............................................2-2
Figure 2-2 New Terrell City Lake Storage, Target Diversion = 6,000 ac-ft/yr .....................................2-3
Figure 2-3 New Terrell City Lake Annual Diversions, Target Diversion = 6,000 ac-ft/yr .....................2-3
Figure 2-4 New Terrell City Lake Storage, Target Diversion = 6,000 ac-ft/yr When Storage Is >50%,
Target Diversion = 1,800 ac-ft/yr W hen Storage Is <50% ...............................................2-4
Figure 2-5 New Terrell City Lake Annual Diversions, Target Diversion = 6,000 ac-ft/yr When Storage
Is >50%, Target Diversion = 1,800 ac-ft/yr When Storage Is <50% ..................................2-5
Figure 3-1 Schematic of New Terrell City Lake Water Supply to Canton ..... .......................3-6
Figure 3-2 Schematic of New Terrell City Lake Water Supply to DWU .......... ........... ........3-7
Figure 3-3 Schematic of New Terrell City Lake Water Supply to NTMWD.......................................3-8
Figure 3-4 Schematic of New Terrell City Lake Water Supply to SRA............................ ..................3-9
Figure 4-1 Aerial View of Dam......... . ..........................4-2
Figure 4-2 Embankment Modifications Alternatives 1 and 2....................... ............................4-12
Figure 4-3 New Principal Spillway Alternatives 1 and 2 ......................... ........................4-13
Figure 4-4 Embankment Modification Alternatives 3 and 4 ...................... ..........................4-16
Figure 4-5 Summary of Modifications .................................. ............................. 4-18
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Texas Water Development Board. Water Supply Facility Planning, New Terrell City Lake, report, September 2011; Fort Worth, Texas. (https://texashistory.unt.edu/ark:/67531/metapth542084/m1/4/: accessed July 7, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting UNT Libraries Government Documents Department.