Texas Department of Licensing and Regulation Strategic Plan: Fiscal Years 2015-2019 Page: 66
iv, 96 p. : ill.View a full description of this book.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
CALCULATION METHOD: Non-cumulative
NEW MEASURE: No
TARGET ATTAINMENT: Lower than target
02-01-05 INSPECTION COVERAGE RATE -KEY
DEFINITION
The total number of inspections completed by agency and third-party inspectors divided by the total number of inspec-
tions required by statutes. Inspections for this measure include those required in BLR, BOX, IHB, ELE, BAR, COS,
APR, TOW, VSF, and BRE regulated industries, but do not include non-certificate boiler inspections or Architectural
Barriers inspections.
PURPOSE
This measure indicates the effectiveness of TDLR's inspection process.
DATA SOURCE
BLR - JO database; BOX - List of inspection events provided by the Combative Sports program; IHB - SQL Server
database maintained by IHB program; ELE, BAR, COS, APR, and BRE inspections recorded in TULIP; and TOWNSF
inspections recorded in TOOLS.
METHODOLOGY
The numerator for this measure is the total number of inspections completed during the reporting period. The denom-
inator is the total number of inspections completed during the reporting period, plus inspections still due at the end of
the reporting period. The result is multiplied by 100 to achieve a percentage.
DATA LIMITATIONS
External Factors: IHB inspections lag by one month and Boiler inspections lag by one quarter, to account for delayed
third-party reporting deadlines. General market and economic conditions, construction trends, statutory changes, addition
or elimination of programs or license types, and the number of third-party inspectors are factors beyond TDLR's control.
Internal Factors: Turnover in inspectors, rule changes, enforcement action and changes to the inspection process may
also impact the measure.
CALCULATION METHOD: Non-cumulative
NEW MEASURE: No
TARGET ATTAINMENT: Higher than target
02-01-06 PERCENT OF BOILER CERTIFICATION INSPECTIONS WITHIN TIMELINES - KEY
DEFINITION
The percent of Boiler certificate inspections performed by agency and third-party inspectors during the reporting period
that were completed no later than thirty days after the certificate expiration date.
PURPOSE
This measure indicates the effectiveness of TDLR's Boiler inspection process.
66 Smaller Smarter GovemmentU
Upcoming Pages
Here’s what’s next.
Search Inside
This book can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Book.
Texas Commission of Licensing and Regulation. Texas Department of Licensing and Regulation Strategic Plan: Fiscal Years 2015-2019, book, 2014-22~; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth639698/m1/74/: accessed July 17, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting UNT Libraries Government Documents Department.