30 Matching Results

Search Results

School Auditorium/Gymnasium, Hawley, Texas: Mechanical Plan

Description: Architectural plan for a school auditorium/gymnasium in Hawley, Texas. It includes a drawing of the building's mechanical plan with notations detailing the plumbing and electrical systems; the rooms on the left of the drawing show the rooms that are situated under the bleachers.
Date: May 31, 1937
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Auditorium/Gymnasium, Hawley, Texas: Floor Plan

Description: Architectural plan for a school auditorium/gymnasium in Hawley, Texas. It includes a floor plan of the building showing the layout of the floor and stage as well as the surrounding smaller rooms. There are two construction schedules drawn in the center of the floor plan outlining the dimensions and materials used in construction.
Date: May 31, 1937
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Auditorium/Gymnasium, Hawley, Texas: Elevation and Details

Description: Architectural plan for a school auditorium/gymnasium in Hawley, Texas. It includes a drawing that details the building's elevation, and another drawing that details the front of the stage. The smaller drawings at the bottom and right side of the sheet detail stage footlights and individual sections of the building.
Date: May 31, 1937
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Plumbing Floor Plans

Description: Plumbing floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5-200 Men, floor plan type L-6 - 250 Men, floor plan type L-3 - 100 Men, floor plan type L-1 - 25 Men, floor plan type L-2 - 50 Men, floor plan type L-4 - 150 Men, capacities of water heaters and hot water storage tanks chart, and legend & notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing

Description: Side elevation drawings for mobilization buildings in support of war efforts. They include typical end wall framing & part elevation, typical cross section showing partitions, typical side wall framing, and small sections for roof framing details.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing

Description: Side elevation drawings for mobilization buildings in support of war efforts. They include typical end wall framing & part elevation, typical cross section showing partitions, typical side wall framing, and small sections for roof framing details.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing & Cross Sections

Description: Wall framing and cross sections for mobilization buildings in support of war efforts. They include typical cross section, typical end wall framing and part elevation, typical side wall framing for all types, typical end wall framing and part elevation, and small detailed mechanical sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Plumbing Floor Plans

Description: Plumbing floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5-200 Men, floor plan type L-6 - 250 Men, floor plan type L-3 - 100 Men, floor plan type L-1 - 25 Men, floor plan type L-2 - 50 Men, floor plan type L-4 - 150 Men, capacities of water heaters and hot water storage tanks chart, and legend & notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Duct Shaft Details

Description: Duct shaft details for mobilization buildings in support of war efforts. They include detail thru duct shaft that is vertical to wall, detail thru duct shaft that is parallel to wall, plan above roof detail of smoke pipe for one story building, and other mechanical sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Typical Details

Description: Typical details for mobilization buildings in support of war efforts. They include typical cross section, typical end wall framing and part elevation, typical side wall framing for all types, and various smaller sections. Separate notes are included at the bottom right.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Various Sections

Description: Various sections for mobilization buildings in support of war efforts. They include support for steam line roller guide, roof sheathing not shown, support for steam line expansion joint and anchorage, part plan of eave, details of ramp to grade, grade detail, typical cross section, cross section at building, section thru cover over roadway, diagrammatic layouts, and notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Heating Details & Specifications & Smoke Pipes For Ranges

Description: Heating details for mobilization buildings in support of war efforts. They include detail of heat ducts for buildings with trusses, detail of hanger typical for all mains, detail of heat ducts for 1st floor ceiling, detail of typical ducts at ceiling, detail of smoke pipe manifold, detail of smoke pipes for ranges, detail of sleeve, weights of sheet metal, fresh air intake louver, detail of volume control damper, and typical schematic arrangement of heater room equipment.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Smoke Pipe Details

Description: Smoke pipe details for mobilization buildings in support of war efforts. They include detail of smoke pipe for one story building, detail thru duct shaft that is vertical to wall, and detail thru duct shaft that is parallel to wall.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Typical Framing Plan

Description: Typical construction details for mobilization buildings in support of war efforts. It includes a typical framing plan, plan showing construction of floors and walls and various types of partitions, and notes.
Date: May 10, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Interior Details

Description: Miscellaneous interior details for mobilization buildings in support of war efforts. They include shelving, lunch counter, work bench, counter, cash drawer, observation window and counter shelf, ticket window, table and mirror in dressing room, shelf and mirror, detail of coal box, bulletin board, screen vent, and fresh air intake louver.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Plumbing Layouts

Description: Plumbing layouts for mobilization buildings in support of war efforts. They include Type L-1 - 25 Men, Type L-2 - 50 Men, Type L-3 - 100 Men, Type L-4 - 150 Men, Type L-5 - 200 Men, Type L-6 - 250 Men, capacities of water heaters and hot water storage tanks, and legend and notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen