181 Matching Results

Search Results

Advanced search parameters have been applied.

School Auditorium/Gymnasium, Loraine, Texas: Mechanical Floor Plans

Description: Mechanical floor plans for a school auditorium/gymnasium in Loraine, Texas. It includes floor plans 12 feet from gymnasium floor and at gymnasium floor, both with mechanical notations and details, as well as cross section diagram and key for electrical and plumbing symbols.
Date: 1939
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building Addition, Mentone, Texas: Elevations and Sections

Description: Elevations and sections for an addition to a school building in Mentone, Texas. It includes elevations of the north, south, east, and west exteriors of the building, as well as longitudinal section, cross section through gymnasium-auditorium, and typical section through locker and toilet rooms.
Date: 1937
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Bus Garage Sheffield, Texas: Foundation and Roof Plans

Description: Architectural plan for a bus garage in Sheffield, Texas. It includes plans for the roof framing and for the foundation; the details for both are drawn and labeled on the left side of the sheet and divided into sections. Also included are sets of notes concerning the framing, slabs, and foundation.
Date: September 1, 1958
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building Kermit, Texas: Floor Plan

Description: Floor plan for a high school building in Kermit, Texas. It includes a layout of the building's main floor plan, as well as detail showing duct at stage and auditorium, section through recirculation duct for gymnasium unit heaters, and a key for electrical symbols.
Date: 1936
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Gymnasium Building Iraan, Texas: Roof Framing Plan

Description: Architectural plan for a gymnasium building at a junior high school in Iraan, Texas. It includes a drawing of the roof framing plan in its entirety, as well as roof framing details broken up into individual sections. The drawing in the top left corner shows the "typical bent detail" of the roof.
Date: February 12, 1959
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Existing Gymnasium Building Sheffield, Texas: Acoustical Alterations

Description: Architectural plan for the acoustical alterations for an existing gym building in Sheffield, Texas. It includes drawings for a plan for the lobby floor, and details concerning the suspended acoustical tile ceiling, end wall, and metal suspension system.
Date: September 1, 1958
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Gymnasium Building Iraan, Texas: Heating Floor Plan

Description: Architectural plan for a gymnasium building in Iraan, Texas. It includes a floor plan for the building highlighting the heating and exhaust system. The drawings on the far left of the sheet detail a heating unit and an exhaust fan. There are two notes on the right side of the sheet that list the heating equipment and exhaust system schedules.
Date: September 1, 1958
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Gymnasium Building Iraan, Texas: Roof and Bleacher Details

Description: Architectural plan for a gymnasium building at a junior high school in Iraan, Texas. It includes details about the roof framing, bleacher framing, and the plan for the bleacher framing. The bleacher framing is divided into individual sections, each with measurements and specifications. The section of drawings at the top of the page shows the details of "bleacher bms & conn's. at cols. of end bents."
Date: September 1, 1958
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Gymnasium Building Iraan, Texas: Floor Plan

Description: Architectural plan for a gymnasium building for a junior high school in Iraan, Texas. It includes the floor plan of the main court, with the boys and girls locker rooms and showers. The plan call for an additional, smaller court located in between the main court and the locker rooms.
Date: September 1, 1958
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building Monahans, Texas: Gymnasium Wing Sections

Description: Gymnasium wing sections for a high school building in Monahans, Texas. It includes longitudinal and transverse sections of the gymnasium, front stair details, typical bleacher seat detail, detail of pipe hanger rods in uniform storage room, typical wall section of woodworking shop, and miscellaneous sections.
Date: 1948
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Grade School Building, Haskell, Texas: Gymnasium Details

Description: Gymnasium details for a grade school building in Haskell, Texas. It includes west elevation of gym showing proscenium, floor plan of stage at west end of gym, section thru stage and proscenium arch, detail elevation of top of brick piers at proscenium arch, section thru proscenium arch, scale details of base of brick pilaster, section, detail section thru bleachers, and detail plan of wall to monitor over gym.
Date: 1936~
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Gymnasium Building Iraan, Texas: Revised Floor Plan

Description: Revised architectural plan for a gymnasium building at a junior high school in Iraan, Texas. It includes drawings for a revised floor plan of the building, including the main gym floor, and the surrounding rooms. Also included are schedules for the wire partition, windows, and doors of the gymnasium.
Date: February 12, 1959
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Gymnasium Building Iraan, Texas: Upper Plan and Room Schedule

Description: Architectural plan for a gymnasium building for a junior high school in Iraan, Texas. It includes a layout of the main court along with the seats around it; the top row of seats is drawn in the upper left corner. The work schedule, or room completion schedule, is outlined on the right of the page, each room of the building has a section to denote its completion progress.
Date: September 1, 1958
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen