43 Matching Results

Search Results

Advanced search parameters have been applied.

Big Lake High School Gymnasium: Third Level Roof Framing Plan

Description: Architectural plan for a high school gymnasium in the Reagan County Independent School District. It includes a large drawing showing the third level roof framing plan as well as a separate drawing detailing the trusses. Also included are smaller drawings that detail the steel beams and their specifications.
Date: November 1, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ballinger High School: Roof Framing and Trusses Details

Description: Architectural plan for a high school building in Ballinger, Texas. It includes a drawing that details the plan for the roof framing, including the roof trusses that go over the auditorium. Also included is a beam schedule in the top left corner of the sheet that further details the materials to be used in construction.
Date: February 10, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ballinger High School: Roof Framing Plan

Description: Architectural plan for a high school building in Ballinger, Texas. It includes a drawing of the roof framing plan and a drawing that details the trusses to be used over the building's auditorium. Also included are two schedules that detail the specifications, and measurements for the materials to be used in construction.
Date: February 10, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Home Economics Building: Framing Plans

Description: Architectural plan for a high school home economics building in the Reagan County Independent School District. It includes a set of drawings detailing the building's foundation details and roof trusses, as well as two drawings detailing the plan for both the roof framing and foundation plans.
Date: November 1, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Roof Framing

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a drawing for the roof framing of the fourth level of the building; the smaller drawings on the left side of the sheet show details of for the framing broken down into individual sections. At the top of the sheet there are drawings for the roof trusses as well as a beam schedule.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen