48 Matching Results

Search Results

Advanced search parameters have been applied.

School Building, Hermleigh, Texas: Floor Plan and Schedules

Description: Architectural plan for a school building in the Hermleigh Independent School District. It includes a floor plan of the building which shows all of the rooms and hallways; there is a door and transom schedule drawn at the top of the sheet. In the upper left corner there is a room finish schedule that details what types of materials will be used in each room for the floors, walls, etc.
Date: March 1, 1942
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Kermit, Texas: First Floor Framing Plan

Description: Architectural plan for a three-story school building in the Kermit, Texas. This drawing includes plans for the framing on the first floor of the building; there are specifications written within the framing plan detailing the materials to be used. There is a "first floor beam schedule" created on the right side of the sheet that specifies the concrete, reinforcement, and stirrup dimensions.
Date: December 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Spur, Texas: Floor Plan and Schedules

Description: Architectural plan for a school building in the Spur Independent School District. It includes a drawing of the building's floor plan with each room labeled accordingly; the gymnasium is located on the far left wing of the building. Also included is a room finish schedule, a door schedule, and a window schedule.
Date: July 1, 1939
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Kermit, Texas: Column and Footing Schedule

Description: Architectural plan for a three-story school building in the Kermit, Texas. It includes a lengthy "column and footing schedule" which takes up most of the upper portion on the sheet, as well as drawings of individual sections of the building. The drawing in the bottom left shows a section of the first floor entrance; the drawing in the bottom center shows a section of a staircase; and the drawing on the far right shows details concerning beams 123, 124, 125, and 125a.
Date: December 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Kermit, Texas: Roof Framing Plan

Description: Architectural plan for a three-story school building in the Kermit, Texas. This drawing includes plans for the framing on the roof of the building; there are specifications written within the framing plan detailing the materials to be used. There is a "roof beam schedule" created on the right side of the sheet that specifies the concrete, reinforcement, and stirrup dimensions.
Date: December 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Field House and Primary School, Kermit, Texas: Floor Plan and Window Schedule

Description: Architectural plan for a field house and primary school building in Kermit, Texas. It includes a floor plan of the building with the different rooms noted within the drawing. There is a door and window schedule along with a room finish schedule detailing the types of wood or tile to be used for the floors, walls, etc.
Date: November 1, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Ira, Texas: Floor Plan and Room Finishes

Description: Architectural plan for a school building in the Ira Consolidated School District. It includes a drawing of the building's floor plan, door and window schedule, as well as a room finish schedule that denotes what type of wood will be used for the finish in the rooms. The floor plan shows the study hall and various class rooms.
Date: September 8, 1942
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Kermit, Texas: Second Floor Framing Plan

Description: Architectural plan for a three-story school building in the Kermit, Texas. This drawing includes plans for the framing on the second floor of the building; there are specifications written within the framing plan detailing the materials to be used. There is a "second floor beam schedule" created on the right side of the sheet that specifies the concrete, reinforcement, and stirrup dimensions.
Date: December 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Cafeteria, Big Lake, Texas: Foundation Plan

Description: Foundation plan for a cafeteria building in the Reagan County Independent School District. It includes a sketch for the building's foundation plan, and smaller drawings that highlight specific sections of the foundation. Also included are construction schedules that contain details about the materials to be used in construction.
Date: May 15, 1949
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Junior High School Building, Eastland, Texas: Construction Schedules

Description: Construction schedules for a junior high school building in Eastland, Texas. It includes three schedules, one for the joint steel bending, stirrup bending, and beam steal bending; each schedules lists the dimensions for the materials to be used in various sections of the building.
Date: April 25, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Gymnasium, Eldorado, Texas: Floor Plan and Schedules

Description: Architectural plan for a high school gymnasium in Eldorado, Texas. It includes a floor plan for the building as well as smaller drawings of showers number 1, 2, and 3. On the left of the sheet there are separate schedules that detail what materials will be used in construction; the room finish schedule states what types of materials will be used on various aspects of the rooms.
Date: July 9, 1957
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Gymnasium: Scheme "A" Foundation Plan

Description: Architectural plan for a high school gymnasium in Big Lake, Texas. It includes drawings detailing the scheme "A" foundation plan for the building; there are numerous drawings of the different sections that make up the foundation. At the top of the sheet there is a pier and footing schedule that contains specifics about the materials used in the construction.
Date: May 10, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Gymnasium: Third Level Roof Framing Plan

Description: Architectural plan for a high school gymnasium in the Reagan County Independent School District. It includes a large drawing showing the third level roof framing plan as well as a separate drawing detailing the trusses. Also included are smaller drawings that detail the steel beams and their specifications.
Date: November 1, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Cafeteria: Floor Plan and Schedules

Description: Architectural plan for a high school cafeteria in the Reagan County Independent School District. It includes drawings showing the floor plan for the building as well as an elevation plan of the North, South, East, and West sides of the building. The drawings on the left side of the sheet show a room finish schedule, and door schedule, a window schedule, and details of the door frames.
Date: November 1, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ballinger High School: Second Story Framing Plan

Description: Architectural plan for a high school building in Ballinger, Texas. It includes drawings that detail the overall framing plan for the floor, various staircases, and beams 217, and 218; there is a beam schedule for the second story created in the top left corner of the sheet.
Date: February 10, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Moore Residence, Hamlin, Texas: Foundation Plan and Details

Description: Architectural plan for a home commissioned by Mr. & Mrs. Fred B. Moore in Hamlin, Texas. It includes a drawing of the home's foundation plan as well as a set of drawings detailing individual sections of the foundation. The schedules at the bottom of the sheet detail more specifics concerning the materials making up the foundation.
Date: February 20, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Third Story Roof Framing Plan

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a drawing that shows the roof framing plan on the third level of the building; also included is a roof beam schedule and a diagram for the typical roof beam steel placement.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ballinger High School: Third Story Framing Plan

Description: Architectural plan for a high school building in Ballinger, Texas. It includes details concerning the framing for the third story of the building, as well as a small, detailed drawing of beam 308; the beam schedule in the top left corner of the sheet shows the specifications for various aspects of the framing materials.
Date: February 10, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Footing Plan and Schedule

Description: Architectural plan for a high school building in the Reagan County Independent School District. It includes a drawing of the building's pier and footing plan as well as two construction schedules with general notes. The drawings on the left side of the sheet show details for the column, pier and footing.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen