88 Matching Results

Search Results

Advanced search parameters have been applied.

School Gymnasium Building Iraan, Texas: Heating Floor Plan

Description: Architectural plan for a gymnasium building in Iraan, Texas. It includes a floor plan for the building highlighting the heating and exhaust system. The drawings on the far left of the sheet detail a heating unit and an exhaust fan. There are two notes on the right side of the sheet that list the heating equipment and exhaust system schedules.
Date: September 1, 1958
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Hermleigh, Texas: Mechanical Plan

Description: Architectural plan for a school building in the Hermleigh Independent School District. It includes a drawing of the building's floor plan with the plans for the heating, electrical, and plumbing systems. Each of the rooms are labeled whether they are recitation rooms, a study hall, or laboratory.
Date: January 20, 1942
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Kermit, Texas: First Floor Plan

Description: Architectural plan for a three-story school building in the Kermit, Texas. This particular drawing shows the floor plan for the first level, including the auditorium, stage, and various classrooms. The plan also displays the electrical, plumbing, and heating setup/codes.
Date: December 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

School Building, Spur, Texas: Mechanical Plan

Description: Mechanical plan for a school building in the Spur Independent School District. It includes a detailed floor plan of the building with notations concerning the electrical, plumbing, and heating systems; there are also footlight details drawn at the top of the sheet.
Date: July 1, 1939
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Field House, Kermit, Texas: Floor Plan and Electrical Work

Description: Architectural plan for a field house and primary school building in Kermit, Texas. It includes a drawing for the floor plan of the field house including the electrical, plumbing, and heating system. The plan shows the various rooms that make up the building, as well as a list of symbols for the heating, plumbing, and electrical systems.
Date: November 1, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Gymnasium: Mechanical Floor Plan

Description: Architectural plan for a high school gymnasium in Big Lake, Texas. It includes a mechanical floor plan that details the building's plumbing, heating, and electrical systems. There is a list in the upper left corner of the sheet that contains the different symbols used for each system.
Date: May 10, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Junior High School Building, Eastland, Texas: Two Story Mechanical Plan

Description: Mechanical plan for a junior high school building in Eastland, Texas. This plan shows the plumbing, heating, and electrical work for both stories of the building; these systems are labeled within floor plans for both stories. On the right side of the sheet there is a riser diagram and a list denoting a code for the electrical symbols.
Date: April 25, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Gymnasium, Eldorado, Texas: Plot Plan

Description: Architectural plan for a high school gymnasium in Eldorado, Texas. It includes a drawing of the plot plan for the building as well as details for the water system. There are three lists on the left of the sheet, one for the plumbing symbols, heating symbols, and for the electrical symbols.
Date: July 9, 1957
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Junior High School Building, Eastland, Texas: Mechanical and Foundation Plans

Description: Mechanical and foundation plan for a junior high school building in Eastland, Texas. It includes two main drawings that show the building's foundation plan with notations for the plumbing, heating, and electrical systems. The drawing at the top of the sheet details the foundation and boiler room of the present high school.
Date: April 25, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

The Professional Building, Abilene, Texas: Area "A" Air Conditioning and Heating

Description: Air conditioning and heating plan for area "A" in the Professional Building of Abilene, Texas. It includes a large drawing of the floor plan for the area with notations and labels detailing the rooms and the air conditioning and heating work. The chart in the upper right corner of the sheet details the symbols used within the floor plan.
Date: November 10, 1952
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Travis Residence, Abilene, Texas: Mechanical Plan

Description: Architectural plan for a home commissioned by Mr. and Mrs. A. E. Travis in Abilene, Texas. It includes a drawing that shows the floor plan with notations for the plumbing and heating systems, and another drawing that shows the electrical work for the home; there are legends that explain the symbols used in each drawing.
Date: February 25, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

The Professional Building, Abilene, Texas: Area "C" Air Conditioning and Heating

Description: Air conditioning and heating plan for area "C" in the Professional Building of Abilene, Texas. It includes a large drawing of the floor plan for the area with notations and labels denoting the rooms as well as the planned lines for the air conditioning and heating systems.
Date: November 10, 1952
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen