Railroad Commission of Texas Drilling, Completion, and Plugging Summary: January 1984 Page: Front Cover
This report is part of the collection entitled: Texas State Publications and was provided to The Portal to Texas History by the UNT Libraries Government Documents Department.
- Highlighting
- Highlighting On/Off
- Color:
- Adjust Image
- Rotate Left
- Rotate Right
- Brightness, Contrast, etc. (Experimental)
- Cropping Tool
- Download Sizes
- Preview all sizes/dimensions or...
- Download Thumbnail
- Download Small
- Download Medium
- Download Large
- High Resolution Files
- IIIF Image JSON
- IIIF Image URL
- Accessibility
- View Extracted Text
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Tat 5b e3$t
TEXAS STATEDOCUMENTS
RAILROAD COMMISSION 0 FTEXAS COLLECTION
DRILLING, COMPLETION, AND PLUGGING SUMMARYFOR PERIOD, JANUARY 1, 1984 THROUGH JANUARY 31, 1984
State Totals
This 1984 1983Activity by
District for This Period
Period To Date To Date 01 02 03 04 05 06 7B
COMPLETIONS
Oil Discovery 45 45 60 0 3 8 8 1 3 11
Oil Existing Field 1,232 1,232 1,146 198 24 126 23 21 56 184
Oil Completions-Total 1,277 1,277 1,206 198 27 134 31 22 59 195
Gas Discovery 102 102 93 1 32 16 38 2 2 6
Gas Existing Field 285 285 291 6 53 55 55 9 24 29
Gas Completions-Total 387 387 384 7 85 71 93 11 26 35
Service Completions-Total 12 12 84 0 0 0 0 0 0 10
TOTAL COMPLETIONS 1,676 1,676 1,674 205 112 205 124 33 85 240NEW HOLES DRILLED
Oil Discovery
Oil Existing Field
Oil Holes-Total
Gas Discovery
Gas Existing Field
Gas Holes-Total
Service Holes-Total
*Dry Wildcat
*Dry Existing Hole
*Dry Holes-Total
TOTAL NEW HOLES DRILLED45
1,23045-
1,23060
1,1170
1983
248
1268
231
213
567C 08 8A 09 10
0 4 4 3 0
103 123 143 172 59
103 127 147 175 59
2 1 0 1 1
23 5 0 10 16
25 6 0 11 .17
0 0 2 0 0
128 133 149 186 7611 0
184 1034
123,4
141172
1,275 1,275 1,117 198 27 134 31 22 59 195 103 127 145 175
80 80 82 1 25 10 30 2 2 6 1 1 0 1
229 229 247 6 41 44 42 9 22 16 22 4 0 7
309 309 329 7 66 54 72 11 24 22 23 5 0 8
0 0 84 0 0 0 0 0 0 0 0 0 0 0
333 333 294 25 27 46 24 14 16 101 17 10 21 25
344 344 326 26 4 28 9 8 10 111 13 7 10 95
677 677 620 51 31 74 33 22 26 212 30 17 31 1202,261
2,261
2,210
256 124 262 136
.0
5959
1
16
17
0
7
23
3055 109 429 156 149 176 303 106
HOLES PLUGGED
Oil 359 359 294 30 3 15 47 3 11 2
Gas 102 102 77 0 21 28 18 1 10 11
Service 31 31 21 0 0 1 3 0 0 1
*Dry 682 682 633 54 31 74 33 22 28 212
TOTAL HOLES PLUGGED 1,174 1,174 1,025 84 55 118 101 26 49 22626 30 29 131 32
5 7 1 0 0
0 13 5 8 0
30 17 31 120 .30
61' 67 166 25-9 62Ntet Total Completions include 51 dual oil and 31p dual gas
* Dry hole data not comparable due to changes in reportinrg- system,NON-CIRCULATING
NTSU LIBRARY
w
NON-CIRCULATiNG
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Matching Search Results
View two pages within this report that match your search.Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Railroad Commission of Texas. Railroad Commission of Texas Drilling, Completion, and Plugging Summary: January 1984, report, January 1984; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth1033539/m1/1/?q=%221984~%22: accessed August 15, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting UNT Libraries Government Documents Department.