Regional Water Plan: Region H, 2016, Volume 1. Main Report Page: Es-6
This report is part of the collection entitled: Texas State Publications and was provided to The Portal to Texas History by the UNT Libraries Government Documents Department.
- Highlighting
- Highlighting On/Off
- Color:
- Adjust Image
- Rotate Left
- Rotate Right
- Brightness, Contrast, etc. (Experimental)
- Cropping Tool
- Download Sizes
- Preview all sizes/dimensions or...
- Download Thumbnail
- Download Small
- Download Medium
- Download Large
- High Resolution Files
- IIIF Image JSON
- IIIF Image URL
- Accessibility
- View Extracted Text
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Executive Summary November 2015
Figure ES-4 - Identified Water Needs by WUG Category by Decade
1,400,000
> ,
* 1,200,000
1,000,000
L 800,000
U
Q 600,000
V)
400,000
z
~ 200,000
0
-2 20202030
2040 2050
2060 2070
Municipal
Livestock
Mining
_ Regulatory Groundwater Disparitys Irrigation
Manufacturing
Steam Electric PowerES.5
WATER MANAGEMENT STRATEGIES
State statute and TWDB rules specify that RWPGs shall identify potentially feasible Water
Management Strategies (WMS) for all WUGs and Wholesale Water Providers (WWPs) with future
water supply needs. As a growing region with expanding populations and increased economic
development, Region H projects substantial needs over the planning horizon through the 2070
decade. In order to address these needs, consideration was given to a wide range of data in
developing recommendations for WMS and associated projects (specific infrastructure or measures
used to increase or manage water supplies). Potentially feasible WMS were identified in three ways.
First, strategies recommended in the 2011 Region H Water Plan for either implementation or
additional study were considered potentially feasible. Next, new strategies were solicited during the
scope development period for the 2016 Water Plan. Finally, sponsoring agencies that conducted
independent strategy studies could bring their reports to the planning group and request they be
considered in the plan. The list of potentially feasible WMs and projects considered by the RHWPG
are listed in Table ES-1.
Table ES-1- Region H Potentially Feasible WMS and Projects
Conservation
Industrial Conservation
Irrigation Conservation
Municipal Conservation
Contractual Transfer
TRA to COH TransferRegion H 2016 Regional Water Plan
Executive Summary
November 2015
i E
ir - - -
I
rI -
i -- ,
iES-6
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Region H Water Planning Group. Regional Water Plan: Region H, 2016, Volume 1. Main Report, report, November 2015; Conroe, Texas. (https://texashistory.unt.edu/ark:/67531/metapth838720/m1/29/?q=%22%22~1: accessed July 16, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting UNT Libraries Government Documents Department.