Addendum to Regional Water Supply Facilities Plan Final Report (April 2011): Searching Inside

We Found:

140 results that matched your query. Showing page 1 of 7.

Page: 3-9 (standard view) | zoom view

... APRIL 2011 Table 3-1. Hidalgo County Projected Municipal Water Surplus and Needs (AF) Water User... 2020 2030 2040 2050 2060 Alamo Nueces-Rio Grande -59 -762 -1... -4,482 -5,602 Donna Nueces-Rio Grande 1,729 1,435 1,117 759 347... Nueces-Rio Grande 6,216 3,826 1029 -1,805 -5,151 -8,580 Elsa Nueces-Rio Grande... -219 -685 -1,206 -1,740 Hidalgo Rio Grande -2 -18 -20

Page: I (standard view) | zoom view

... APRIL 2011 Table of Contents Executive Summary Chapter 1 Introduction Background....................................... 1-1 Project Need................................... 1-2 Purpose and Objectives.................. 1...-2 Study Guiding Principles.......1-3 Public Involvement............... 1-3 Chapter 2 Water Rights Texas... Water Rights Regulations.... 2-1 Project Water Rights.............. 2-2 Legal Investigations... and Coordination ................................. 2-2 Chapter 3 Water Supply And Demand Analysis HCDD No.1

Page: 3 (standard view) | zoom view

... is not a recommended or alternative water management strategy. Please see plan Section 4.9.1, page 4-104. Please... 3:.total deficit:for Hidalgo County. Please see plan Section 4.2.1.2, page 4- 9, Table 4.5: 2030 needs =... Plan projections. 3. Page 1-1, Column 1, paragraph 2: Please clarify in:the final report how conversion... a minimum- 2 acre-feet of irrigation water rights to convert to 1 acre-feet of municipal water rights... the water conversion issue. 4. Page 1-1, Column 2; paragraph 2; and Page 1-2, Column 2, paragraph 2: Water

Page: 1 (standard view) | zoom view

... County Drainage District No. 1 on February 14, 2011. For ease of review we have provided verbatim... comments are addressed here and incorporated in the final report. Level 1 Comments 1. Comment: Please... of Chapter 1 2. Comment: In several instances, this draft report refers to data in the draft Region M water... at http://www.twdb.state.tx.uswrpi,/rwp/3rdRound/2011 RWP/RegionM/ a) Page 1-1, Column 1, paragraph 2; and Page 3-9, Table 3-1: The projected Hidalgo... County municipal water surplus/needs volumes. Please see plan Section 4.2.1.2, page 4-9, Table 4.5

Page: Page1 (standard view) | zoom view

... wractive080410 WRNo WRType WRSeq AppNo WRIssueDate 6 1 6 1 10/1.../1986 10/1/1986 1 1 5396 6/16/1992 2 0 6 1 12/16/1970 8/26/1988 AmendmentLetter... CancelledStatusCode OwnerName HIDALGO CO IRR DIST 1 ENGLEMAN IRRIGATION DIST T A HANNIS T TURBERVILLE ET AL J H... PLETCHER ET AL STEVEN R BAKER OwnerTypeCode 2 2 4 1 Active Inactive P 1 4523 4524 5396 5396 5396 DiVA

Page: 2 (standard view) | zoom view

... c) Page 1-2, Column 1, paragraph 3: The year 2060 projected population stated for Hidalgo County... does not appear to match this draft report's page 3-3, paragraph 1, as well as the Region M plan... updated to match the 2011 Region M Regional Water Plan population projections. d) Page 1-2, Column 1..., paragraph 3: The stated 50-year increase in municipal water needs. Please see plan Section 4.2.1.2, page 4-9...) Page 1-2, Column 2, paragraph 2: The water management strategy status of the HCDD #1 project. Please

Page: 7-12 (standard view) | zoom view

... MGD 3500 1.0 MGD 17000 1 1MD 7000' I 1 OF 2 FILTER BACKWASH HOLDING V=30,000 CF FROM FILTER... WASTE SOURCE BACKWASH 1" 2 OF 2. 12... AND SEDIMENTATION HOLDING UP TO 2 GPM @50' WASTE FOR1 MAX DAY BACKWASH CYCLES SPUMP SLUDGE... 3 1.5 MGD 5500 GPM 4 I IGE LI TF DG/ I.I eIAI SLUDGE HOLDING/RECYCLING SIZE (IN FEET) PLANT... 100 85 125 1 .55-000 5 MGD 40 100 100 140 1 62,000 10 MGD 40 100

Page: 6-4 (standard view) | zoom view

... 0 APRIL 2011 Table 6-1: Raw Water Sampling and Water Quality Parameters Paramreter Un... I Color Pt-Co units 30 Urtr ated Water Quaity Site 2 S e Alkalinity (mg/L) 1 mg/L120... 410 420 00 lidgsuum 1i; i mgL... 450 410 370 Aluminum, Al mg/L 1....98 1.35 <01 1.68 Iron Fe (Total and Dissolve) mgL 0 662(T

Page: III (standard view) | zoom view

... APRIL 2011 List of Figures Figure 1-1. Hidalgo County and Hidalgo County Drainage District... No.................1-4 Figure 2-1. North Main Drain Drainage Basin Delineations.......................2-3 Figure 3-1...:............................................................................ 3-7 Figure 3-4. Current Water Supply Network and Service Areas ..................3-8 Figure 4-1... III Facilities Plan Layout.................................4-12 Figure 5-1. Intake Structures............................................ 5-7 Figure 6-1. Source Water Sampling Locations ............................6-3 Figure 6-2. ACTIFLO

Page: 7-3 (standard view) | zoom view

... TANKS 3 MGD 10 25 15 1 5 MGD 20 50 15 1 10MGD 20... 16 16 12 EACH PUMP SIZE = 2500 GPM @(30' 10MGD 36 36 12 1..." TO FILTER INSTALLATION NOTES 1. HALF-UNDERGROUND 2. H SPS & FILTER BACKWASH PUMPS ARE EXPOSED TO THE AIR... TANKS 3MGD 15 22 12 2 5MGD 15 22 12 3 1O MGD 15... 1B) CDD1 .HIDALGO COUNTY DRAINAGE DISTRICT CONCEPTUAL PLANT PROCESS

Page: 1-4 (standard view) | zoom view

... County Drainage District No.1 ''%o ----- '... Ot ---HCDD No.1 Master Drainage System... Vfexi # - Non-HCDD No.1 Flood Channels 8gavo... C0 Civl Systems - Engineering, Inc. i C1I'3L'> HCDe R regional Water Fa lities Paming Hidalgo... County and HCDD No 1 July 2010 Figure 1-1. Hidalgo County and Hidalgo County Drainage District No.1

Page: 7-4 (standard view) | zoom view

... A (s A/ T wwF 10 MGD 700 15 tGD WASTE SOURCE 1 OF 2 FILTER BACKWASH HOLDING V=30,000 CF FROM FILTER... WASTE SOURCE BACKWASH 1" 2 OF 2- 2'PIPE... UP TO 2 GPM @ 50' WASTE FOR 1 MAX DAY BACKWASH CYCLES 2GP z SLUDGE DRYING BED CONCRETE, EXP... BEDS 1 MGD 20 150 6 6 15 MGD 20 . 150 6 S 10 AAGD 20 150 6 6 15 MGD 20... CAPACITY TANKS VOLUME CF 3 MGD 40 100 851125 1 55 000 5 MGD

Page: 1-1 (standard view) | zoom view

... of South Texas, as shown in Figure 1-1. It covers 1,583 square miles and is bordered by Cameron... of irrigation water rights to convert to 1 municipal water rights. acre-feet of From a municipal perspective... Water Development Board (TWDB). The Hidalgo County Drainage District No.1 has jurisdiction over more... than 50 percent of Hidalgo County, as shown Figure 1-1. It has a desire to investigate potential water... and shallow groundwater. HCDD No.1 drainage system does not receive floodwater from Rio Grande River under

Page: 7-16 (standard view) | zoom view

... rfu2 F I I .I.... .w. 1 i i i I L... ... .J I - FENCE -- - - -- - FUTURE BUILDINGS Building... Width Length Weight Below Grade? 1 40 100 15 No 2... 10 MGD WATER TREATMENT PLANT LAYOUT #4 - RECTANGULAR NO. 1... TOTAL AREA =10.12 ACRES .S SCALE: N.T.S. _______1uEnglnw rtnginc. (1in----1 n-a77966em FaQ FIA REA, t48... Figure 7-8. Water Treatment Plant Layout - Rectangular REGIONAL WATER SUPPLY FACILITIES PLAN -1 4. Z- [b

Page: 8-4 (standard view) | zoom view

... S APRIL 2011 Table 8-1 Estimate of Probable Capital Costs - Alternative A - ACTIFLO + DMF No.... Descriptions 3 MGD 5 MGD 10 MGD 15 MGD 1 General Items... $625,000 $625,000 $625,000 3 High Rate Clarification (Actiflo) $1,265,879 $1...,537,095 $3,001,320 $4,405,055 4 Filter Complex $1,914,019 $2,272,165 $2,817,430... $3,565,295 5 Clearwell & Effluent Pumping Facilities $531,965 $693,941 $1,258,882 $1,823,823 6

Page: 7 (standard view) | zoom view

... for public water supplies. In general, the acceptable levels of TDS are ranged from 500 to 1,000 mgIL. Pilot... for public water supplies. In general, the acceptable levels of TDS are ranged from 500 to 1,000 mg/L. Pilot... been updated accordingly. Level 2 Comments 1. Please ensure that the final report is printed.... Response: The report has been updated accordingly. 3. Page 1-1, Column 2 refers to "Figure 1". Please... correct this to Figure 1-1 (page 1-4). Response: The report has been updated accordingly. 4. Throughout

Page: 7-10 (standard view) | zoom view

... TANKS 3 MGD 10 25 15 1 5MGD 20 50 15 1 10MGD 20 50... 110 25 WASTE SOURCE TO SLUDGE 1 OF 2 HOLDING/RECYCLE BASIN (SEE FIGURE 4C) BACKWASH... PUMPS FOR ALL NUMBER OF PUMPS =5 EACH PUMP SIZE = 2500 GPM @ 30' 1 AIR BLOWER BFV MA .:; - V N TO DMF/RO... MIXING VAULT (SEE FIGURE 4B) TO RO B (SEE FIGURE 4B) N CDD#1 . HIDALGO COUNTY DRAINAGE DISTRICT... Figure 7-4-1 Conceptual WTP Process Train for Alternative D - ACTIFLO + DMF + RO REGIONAL WATER SUPPLY

Page: 6-15 (standard view) | zoom view

... Lactose (Sugars) 0.001 100 200 1,000 ndotoxin Pyrogen Silica 0.01 0.1 E Coat Pigent Red Blood Cels ictera... cm Enulson Bue lndgo Gye I 8m CeIs Fat Mcenes Acwsated Carbon Cryptospotdim Giardia Cyst 1I0 20.000... 100,000 500,000 1 MM 10 Human Hair 100 5 MM Note: 1 micron (micrometor) . 4 x 10-5 inches - 1 x 104... REGIONAL WATER SUPPLY FACILITIES PLAN I 1000 4 I 1 k Proteins 6-15

Page: 7-9 (standard view) | zoom view

... 5 MGD 3500 GPM 2 (CONCRETE, EXP. TO AIR) 1 OF 2 .... WASTE FOR 1 MAX DAY BACKWASH CYCLES SLUDGE HOLDING/RECYCLING BASIN D CHC B A SLUDGE HOLDING/RECYCLING... 3 MGD 40 100 85 125 1 1 . 55000 BACK TO SLUDGE HOLDING/RECYCLE DRY SLUDGE PUMP... 3500 GPM 3 .5 MGD 5500 GPM 4 5 MGD 40 100 1001401 1 Z 62:000 10 MGD 40 100 1357 7505 20... 1,000 15 GD j0 10 75 15 1J040J C0D.1 HIDALGO COUNTY DRAINAGE DISTRICT

  • Enclose phrases in quotation marks.
  • Use alternate spellings.
  • Limit or remove special characters and punctuation.

When this item was originally scanned, we used Optical Character Recognition (OCR) technology to "read" and save text embedded in the image. OCR is not fool-proof, however. While the overall quality of the OCR results is generally good, the results may vary depending on legibility of the original materials.

Back to Top of Screen