Addendum to Regional Water Supply Facilities Plan Final Report (April 2011) Page: Letter Of Transmittal
This report is part of the collection entitled: Texas State Publications and was provided to The Portal to Texas History by the UNT Libraries Government Documents Department.
- Highlighting
- Highlighting On/Off
- Color:
- Adjust Image
- Rotate Left
- Rotate Right
- Brightness, Contrast, etc. (Experimental)
- Cropping Tool
- Download Sizes
- Preview all sizes/dimensions or...
- Download Thumbnail
- Download Small
- Download Medium
- Download Large
- High Resolution Files
- IIIF Image JSON
- IIIF Image URL
- Accessibility
- View Extracted Text
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Civil Systems
Engineering, Inc.
P.O. Box 572373
Houston, TX 77257
9894 Bissonnet St.
Suite 404
Houston, TX 77036
(713) 782-3811
(713) 782-3812 (Fax)
May 21, 2011
Ms. Connie Townsend, P.E.
Project Manager - Regions E, J, &M
Water Resources Planning Division
Texas Water Development Board
1700 North Congress Ave.
Austin, Texas 78701
Re: Addendum to Final Regional Water Supply Facilities Plan Report - Hidalgo County, Texas
TWDB Contact No. 0804830848
Dear Ms. Townsend,
Submitted is the Addendum to the Final Regional Water Supply Facilities Plan Report, dated April
2011. The Addendum addresses TWDB's comments to the Final Report as outlined in an email and
letter to Mr. Godfrey Garza, Jr., District Manager of Hidalgo County Drainage District No.1, dated
April 29, 2011. This submittal includes the following items:
1. A hardcopy addendum with an original signed cover letter.
2. Six (6) printed copies of letter/addendum to be inserted in the preciously submitted
Final Reports.
3. Six (6) CDs with complete deliverables: Final Report with this Addendum and April
4, 2011 Memorandum.
Sincerely,
Deren Li, Ph.D., P.E., D.WRE, CFM
President
Enclosuresc: Godfrey Garza, Jr., District Manager of Hidalgo County Drainage District No.1
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Matching Search Results
View 140 pages within this report that match your search.Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Civil Systems Engineering, Inc. Addendum to Regional Water Supply Facilities Plan Final Report (April 2011), report, May 2011; Houston, Texas. (https://texashistory.unt.edu/ark:/67531/metapth839161/m1/1/?q=%22~1%22~1: accessed July 16, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu.; crediting UNT Libraries Government Documents Department.